How long does SOC 2 take? The short answer

For a company starting from scratch, a SOC 2 Type 1 report typically takes 2 to 4 months from kickoff. A first SOC 2 Type 2 report typically takes 6 to 12 months, because the auditor has to observe your controls operating over a review period before issuing an opinion.

Those ranges are wide because three things vary from company to company: how many controls you already have in place, how long a review period you choose and how quickly your team can produce evidence. This guide breaks the SOC 2 timeline into phases so you can estimate your own.

SOC 2 timeline by phase

Phase

What happens

Typical duration

 

1. Scoping

Define the system boundary, select Trust Services Criteria, choose Type 1 or Type 2

1 to 2 weeks

2. Readiness assessment

Compare current controls with the criteria and list the gaps

2 to 4 weeks

3. Remediation

Write policies, configure technical controls, assign owners, start collecting evidence

4 to 12 weeks

4. Type 1 examination

Auditor reviews control design as of a date

2 to 5 weeks

5. Type 2 review period

Controls operate and evidence accumulates

3 to 12 months

6. Type 2 fieldwork

Auditor samples and tests evidence from the period

2 to 6 weeks

7. Report drafting and issuance

Draft, management review, final report

2 to 4 weeks

Phases 1 through 3 are within your control. Phase 5 is fixed once you choose it, and no amount of effort shortens it.

Type 1: the faster route

A Type 1 report assesses whether controls are suitably designed at a single date. There is no observation period, so the timeline is scoping, readiness, remediation and the examination itself.

A company with a small team, a single cloud environment and some security practices already running can reach a Type 1 report in about two months. A company writing its first policies and rolling out multifactor authentication from zero should plan for three to four.

How long does SOC 2 Type 2 take?

A Type 2 report covers a period of time. The calculation is:

readiness and remediation + review period + fieldwork and reporting

With a three-month period, a prepared company can hold a Type 2 report about six months after kickoff. With a six-month period, expect nine months. With a twelve-month period, expect well over a year for the first report.

After the first report, the cycle becomes annual. Each new report covers the 12 months after the previous one, and the wait is only for fieldwork and drafting.

What the SOC 2 audit period is and how to choose it

The SOC 2 audit period, also called the review or observation period, is the window during which the auditor tests whether your controls operated. You and your CPA firm agree on it before it starts.

  • Three months is generally the shortest period auditors accept. It gets a Type 2 report into your customers' hands fastest. Some enterprise buyers consider it too short.

  • Six months is a common choice for a first report and is widely accepted.

  • Twelve months is the standard for renewals and gives customers continuous coverage year over year.

Ask your largest prospects which minimum period they accept before you decide. Choosing three months and then learning a key customer wants six costs you a second examination.

What slows a SOC 2 project down

Most delays come from the same few causes.

  1. Late scoping decisions. Changing the system boundary or adding criteria midway restarts parts of the work.

  2. No control owners. Controls assigned to "the team" do not get operated on schedule.

  3. Policy writing left to the end. Policies need approval dates that precede the review period.

  4. Slow evidence collection. Screenshots and exports gathered by hand in the last week are often incomplete or dated outside the period.

  5. Vendor gaps. Missing security reviews or agreements for key subprocessors.

  6. HR process gaps. Background checks, security training and offboarding records are frequent sources of exceptions.

  7. Auditor availability. CPA firms book fieldwork weeks ahead, and the fourth quarter fills early.

  8. Penetration test timing. A test scheduled after the period closes cannot serve as evidence for it.

How to shorten the timeline without cutting corners

  • Run a readiness assessment before engaging the auditor, so remediation starts from a clear gap list

  • Limit the first report to the Security criteria and the systems customers care about, then expand later

  • Engage the CPA firm early and reserve fieldwork dates

  • Assign one named owner for each control

  • Start the review period as soon as the last gap closes

  • Check evidence monthly during the period, not at the end

  • Schedule the penetration test in the first half of the period

None of these skips work. They remove waiting.

A sample timeline built around a deal deadline

Suppose a customer needs a Type 2 report in nine months.

Month

Activity

 

1

Scoping, readiness assessment, CPA firm selected

2 to 3

Remediation, policies approved, controls live

3

Optional Type 1 as of the end of the month, to give the customer an interim report

4 to 6

Three-month review period, with a penetration test in month 4

7

Fieldwork

8

Draft report and management review

9

Final Type 2 report delivered

If the customer insists on a six-month period, the same plan runs to month 12, and the Type 1 report becomes more important as an interim deliverable.

Where Digisecuritas fits

Digisecuritas handles the phases before and during the review period: scoping, the readiness assessment, control design, evidence review, readiness testing and preparation for the examination. An independent CPA firm performs the examination and sets the testing approach with you. Our SOC 2 readiness page describes each service.

Get dates you can give your customer

Share your deal deadline and where your controls stand today. We will map out a timeline with a Type 1 or Type 2 target that you can put in writing.

Get a timeline built around your deal deadline


Frequently Asked Questions

Related reading